The 6 tonne Fast-Flow Hopper is amazing, increased productivity 10 fold!
Turftech, New Zealand
Testimonials
 

Berwick Rangers Football Club

Hired Supertrencher 450 and 3 Tonne Fast-Flow Hopper May 2010
We have completed the works at Sheffield Park, it's an absolutely superb machine, we have been very impressed with the performance, it has made a great job.

Carolina Green Corp.

"Carolina Green Corp. has run the Shelton Supertrencher 625 in our sports field construction business many years over a wide range of soil types and field conditions. It has performed consistently in all applications and delivered high production with minimal maintenance. It is a quality built machine."

Chad Price
Agronomist, CSFM, Certified Field Builder

Cavendish Golf Club

After installing Lightening Drain on 2 greens in 2009 " The difference in the greens is like night and day, we will be doing a further 6 greens this Autumn"

Peter Smith Head Greenkeeper

McNab Sports

22nd September 2010.

Hired 3 Tonne Gravel Band Drainer to install secondary drainage near Carlisle.

"The jobs gone really well, it's a fantastic machine, the men say I need to buy one it's the way to go"

Duncan McNab

Farnham Golf Club

9th September 2010.

Greens chairman "The greens drainage has transformed the course."

Greentech

Hugh Murray talking about 6 tonne Fast-Flow at Carrick GC

"We purchased the Shelton 6 tonne Fast-Flow Hopper, which speeded up our backfilling operations considerably"

"A period of wet weather delayed the work, resulting in the job being suspended whilst some important matches were completed; we were able to leave the site in good order to allow the golf to go ahead, which is a testament to the backfilling equipment."

Henley Golf Club

Re Lightening drain on greens

Talking about the drainage installed on 3 greens in 2009 "We are over the moon"

Justin Robinson Head Greenkeeper

Sportsmaster

10th September 2010.

Supertrencher+ 625 " We've just completed a job in Edinburgh that we wouldn't have been able to do with our old machine. We have completed work this year with the new machine that we wouldn't have even taken the old machine on site for because we know we couldn't have done it."

Turftech, New Zealand

The 6 tonne Fast-Flow Hopper is amazing, increased productivity 10 fold!

Aaron Hutton, Manager Eastern Division

I have just been out to watch the super trencher doing its thing. The Fendt now has the correct wheels and tyres and all looks a million dollars.

Rob Briscoe, Owner